Kaiser Permanente Master Plan for Two Laboratory Buildings, a total campus reconceptualization for two advanced laboratory buildings

Kaiser Permanente Campus Master Plan for Two Laboratory Buildings //

To explore the feasibility of developing a new building either connected or adjacent to their Sherman Way Laboratory Campus, Kaiser Permanente National Facilities Services hired RACAIA Architecture to design a Master Plan and execute a master program for groups currently housed in the Kaiser Permanente Sherman Way Campus, which reconceptualized the placement of two (2) buildings with open ground parking in a 368,000 SF lot (approx.).

The Master Plan showed the overall design of open space and buildings that tied the campus together, defining its visual character and included three (3) code compliant schemes with the following components:

1. Existing building & Utility Yard

2. New Building & Utility Yard

3. Parking Layout (including standard, compact and required HC stalls)

4. Pedestrian and Vehicular Systems

5. Landscaping

6. A Building-Wide Analysis of all Laboratories and User Groups to best determine strategies and efficiencies based on user preferences and technological requires 

Below are outlines for the two (2) final master plan schemes, which required a range of in-person meetings with every available user group, Kaiser Permanente Project Managers and the KP heads of development and construction. 

 

LOCATION

North Hollywood, CA

DATE COMPLETED

2016

SQ FT

368,000

 

CLIENT

Kaiser Permanente National Facility Services

STATUS

Complete

 
Previous
Previous

BNP Paribas/Bank of the West Pasadena Wealth Management Offices, a historical building restored to enhance the 1920s glamour

Next
Next

Macy Intermediate School Community Learning Garden, with Extreme Makeover’s celebrity landscape designer Eduardo Xol